Additional road end post for barrier U- 12b | fi60,3 mm hot-dip galvanized | total height of post 1500mm | To be concreted in

165,00  brutto

Additional end road post for barrier U-12b | fi 60.3 mm hot-dip galvanized | post height 1500 mm | To be concreted in

Durable and sturdy end post for U-12b barriers with a diameter of fi 60.3 mm and a height of 1500 mm, made of hot-dip galvanized steel for long-term protection against corrosion. Designed to terminate chain barriers in public and industrial spaces and parking lots. Mounting for concreting ensures stability, durability and resistance to intensive use.

Additional road end post for U-12b barrier – fi 60.3 mm, hot-dip galvanized, height 1500 mm (To be concreted in)

End post for U-12b barriers with increased diameter fi 60.3 mm is a solid and durable element for terminating chain barrier strings in public and industrial spaces, as well as in logistics areas and parking lots. The height of 1500 mm allows it to be consistent with other elements of the fencing system.

Made of hot-dip galvanized structural steel, it provides excellent weather and corrosion resistance. Mounting for grouting allows permanent and secure embedment in the ground, even under intensive use in harsh outdoor conditions.


Key features of the U-12b end post:

Diameter: fi 60.3 mm – greater rigidity and stability
Overall height: 1500 mm – compatible with U-12b barrier system
Material: structural steel
Coating: hot-dip galvanizing – corrosion protection
Mounting: to be concreted in – durability and resistance to damage


📌 Application:

🔹 Industrial and logistics facilities – termination of security routes
🔹 Parking pedestrian routes – aesthetically pleasing and durable termination of barrier systems
🔹 Construction and project sites – secure access restriction
🔹 Public spaces – complementing U-12b barriers
🔹 Loading areas – organization and access control


📏 Technical specifications:

Type: end post for U-12b barrier
Post diameter: fi 60.3 mm
Overall height: 1500 mm
Material: hot-dip galvanized structural steel
Installation: to be concreted in
Use: external and internal

Products are made to order. The standard lead time depends on the type of product finish:

  • For products that do not require hot-dip galvanizingdelivery time up to 7 working days.
  • For hot-dip galvanized products – delivery time up to 14 working days.

We strive to complete each order as quickly as possible, maintaining the highest standards of quality and precision workmanship.